Skip to content

From Monday 13 August Energy Resources Division will relocate to level 4, 11 Waymouth Street, Adelaide 5000.  Don't forget to update your links and bookmarks to http://energymining.sa.gov.au/petroleum

Policy for well logging and sample programs

Infill and development wells

Where the agreed open hole logging program could not be achieved after at least 2 attempts over the target zones, a PDK-100 (thermal neutron) log will be run after casing has been set.

A minimum CBL-GR log may be accepted in such wells without the necessity to acquire open hole logs or PDK-100, provided there is good well control from nearby wells.

Minimum washed cuttings sample to be submitted to DPCis 200g per interval.

Core and cuttings to be submitted to DPC as specified in Petroleum Core and Cuttings Submission Form including the guidelines (PDF 146 KB)

Exploration wells

As above for cased hole logging, but if the well is to abandoned, at least 3 attempts to acquire logs must be made.

Minimum washed cuttiings to be submitted to DPC as specified in Petroleum Core and Cuttings Submission Form including the guidelines (PDF 146 KB).