Skip to content

To report a serious incident to DEM, as required by Section 85(2) of the Petroleum and Geothermal Energy Act 2000, licensees should contact the serious incident report no: (08) 8463 6666.

Spitfire_2IMG_2138Ensign_Rig_965_drilling_Holdfast2_February_2013QSN3_Pipeline_Construction_October_2011

Leigh Creek Energy In-Situ Gasification

This proposed demonstration plant will involve the establishment of a single gasifier chamber and associated above-ground infrastructure to produce synthesis gas (commonly referred to as syngas) for a short period of time (approximately 2-3 months), to test the syngas composition and process performance to enable consideration of potential commerciality.

Read more

SAPEX Fracture Stimulation Activities in the Arckaringa Basin

SAPEX are proposing to undertake fracture stimulation operations on petroleum wells in the Arckaringa Basin of South Australia.

Read more