Update 11 April 2024 – Legislation has been amended
Please refer to current legislation Energy Resources Act 2000 and Energy Resources Regulations 2013.
The amended legislation supersedes the Petroleum and Geothermal Act 2000 and Petroleum and Geothermal Energy Regulations 2013.
Guidelines and policies have yet to be reviewed in accord with the amended legislation, any updates of these documents will be advised accordingly.
For further information please contact DEM.Petroleum@sa.gov.au
This register provides public access to environmental data as required under the Energy Resources Act 2000 and associated regulations.
On this page
Provision of this public register is part of a strategy to demonstrate that there is transparency and accountability in decision-making processes.
Section 106 and Section 107 of the Energy Resources Act 2000 (ER Act) require that an Environmental Register be established for public inspection.
The Act specifies that the following data will be contained in the register:
- Environmental impact reports;
- Environmental Impact Assessment Criteria;
- Statements of environmental objectives that have been approved under the Energy Resources Act 2000;
- Reports of a prescribed kind submitted by licencees;
- Any other documents prescribed by Regulation, which includes:
- Written submissions received through public consultation on EIR and SEO documents as per Regulation 14(6);
- Activities determined under Section 74 of the Act to be low official surveillance.
The Minister also has the discretion to include other data such as:
- Fitness for Purpose Reports and Emergency Response Drill Reports subsequent to consultation with licensees.
For more details on information that is required to be made available, or may be made available with the approval of the Minister for Energy and Mining, under the ER Act and Energy Resources Regulations 2013 (ER Regulations), please see the Department's Information Release Policy on the Policies and Guidelines page.
SEO and EIR reports
Copies of current Environmental Impact Reports (EIR) and Statements of Environmental Objectives (SEO) prepared by licensees are contained here, grouped in types of regulated activity. In some cases Other Documentation (OTH), including addendums to EIRs, Risk Assessments, Hydrogeological Assessments and any other relevant documentation, where required to be submitted by the licensees and have been included in the listings below where relevant.
For more information on EIRs and SEOs please refer to the Activity Approvals Process.
* - Please note that gazetted dates with an asterisk indicate an extension of time for the 5-year review has been granted for that particular Statement of Environmental Objectives in accordance with Section 134 (1) of the Energy Resources Act 2000. All extensions of time can be accessed via the Licence Register.
^ - Please note that dates with this symbol indicate the Operator has initiated their review or submitted an updated Statement of Environmental Objectives to DEM in accordance with Part 12 of the Energy Resources Act 2000. Please note until such time that the review is undertaken and the revised documents (if required) are approved by the Minister or his delegate and formally gazetted, the current approved SEO remains in effect and all relevant activities must remain compliant with the current version available on the Environmental Register.
+ - Please note that gazetted dates with this symbol (+) indicate that a Statement of Environmental Objectives has undergone a review pursuant to section 134 of the Energy Resources Regulations 2013 and as a result of the review, it has been determined by the Minister or his delegate that a revision of the document is not required.
Operator | Basin | Activity | Gazetted | Document | |||
---|---|---|---|---|---|---|---|
Gold Hydrogen | Stansbury | PEL 687 Yorke Peninsula Natural Hydrogen Exploration Drilling and Well Testing | September 2023 | EIR | SEO | EIC | N/A |
Geothermal Resources | Arrowie | GEL 181 Drillhole Logging, Monitoring, Maintenance, Rehabilitation and Decommissioning | April 2023 | EIR | SEO | EIC | N/A |
Santos | Cooper | Drilling, Completions and Well Operations | September 2021 | EIR | SEO | EIC | N/A |
SAPEX | Arckaringa | Exploration Drilling Activities |
February 2021 | EIR | SEO | EIC | N/A |
Leigh Creek Energy | Telford | PEL 650 Drilling Operations |
March 2020 | EIR | SEO | EIC | N/A |
Beach Energy | Otway | Drilling, Completions and Well Production Testing |
September 2019 | EIR | SEO | EIC | N/A |
SAPEX | Arckaringa | PEL 122 & 123 Fracture Stimulation Operations | April 2019 | EIR | SEO | EIC | N/A |
Senex Energy | Cooper | PEL 182 Controlled Access Zone Drilling, Completions and Well Operations |
November 2016+ | EIR | SEO | EIC | OTH |
Ahava Energy | Officer | Exploration Drilling Activities in the APY Lands Region |
November 2015+ | EIR | SEO | EIC | OTH |
Operator | Basin | Activity | Gazetted | Document | |||
---|---|---|---|---|---|---|---|
Beach Energy | Cooper | Petroleum Production Operations | March 2024 | EIR | SEO | EIC | N/A |
Strike Energy | Cooper | Multi-well Exploration and Appraisal Production Testing from Deep Coals in PEL 96 | October 2020 | EIR | SEO | EIC | OTH |
Beach Energy | Otway | Onshore Otway Petroleum Production Operations | April 2019 | EIR | SEO | EIC | N/A |
Santos | Cooper | South Australian Cooper Basin Production and Processing Operations |
October 2017^ | EIR | SEO | EIC | N/A |
Senex Energy | Cooper | Production Operations |
September 2017* | EIR | SEO | EIC | N/A |
Operator | Basin | Activity | Gazetted | Document | ||
---|---|---|---|---|---|---|
Gold Hydrogen | Stansbury | Low impact on-road geophysical activities | May 2024 | EIR | SEO | EIC |
Dept. for Energy and Mining | State-wide | Low impact preliminary exploration and survey activities in South Australia | March 2023 | EIR | SEO | EIC |
Beach Energy | Otway | Geophysical Operations | May 2021 | EIR | SEO | EIC |
Leigh Creek Energy | Telford | Geophysical Operations in PEL 650 | September 2020 | EIR | SEO | EIC |
Santos | Cooper | Cooper Basin and Arid Regions Geophysical Operations | October 2018 | EIR | SEO | EIC |
Operator | Licence | Activity | Gazetted | Document | ||
---|---|---|---|---|---|---|
Epic Energy | PL 03 & 04 | South East Pipeline System |
April 2023 | EIR | SEO | EIC |
Epic Energy | PL 01 & 12 | Moomba to Adelaide Gas System & Beverly Lateral |
July 2022 | EIR | SEO | EIC |
APA Group | PL 16 | SESA Katnook/Ladbroke Grove Gas |
April 2022 | EIR | SEO | EIC |
APA Group | PL 07 & 08 | Moomba to Sydney Gas & Moomba to Sydney Ethane | January 2022 | EIR | SEO | EIC |
SEA Gas | PL 13 | Port Campbell to Adelaide | August 2021 | EIR | SEO | EIC |
APA Group | PL 18 | QSN Link (Ballera Qld to Moomba SA) |
April 2020 | EIR | SEO | EIC |
APA Group | PL 06 & 11 | Angaston to Berri Transmission and Murray Bridge (Riverland) Gas |
June 2018^ | EIR | SEO | EIC |
Santos | PL 02 | Moomba to Port Bonython Liquids |
October 2017^ | EIR | SEO | EIC |
Construction and operation of the PL 17 Jackson (Qld) to Moomba (SA) pipeline is in accordance with the South Australia Cooper Basin Joint Venture Statement of Environmental Objectives for Production and Processing Operations. Please refer to the Production and Processing Operations Activity Reports section.
Operator | Basin | Activity | Gazetted | Document | |||
---|---|---|---|---|---|---|---|
Leigh Creek Energy | Telford | In Situ Gasification Pilot Plant |
April 2018+ | EIR | SEO | EIC | OTH |
During the Stage 3 Activity Notification process, LCK were required to develop to the satisfaction of DEM and other co-regulators a Groundwater and Soil Vapour Monitoring Plan (GSVMP) and an Air Quality Monitoring Plan (AQMP). This was a requirement of the Statements of Environmental Objectives (SEO) and is key in measuring the level of compliance with the SEO Objectives and relevant assessment criteria. Links to the relevant monitoring plans can be found below.
Groundwater and Soil Vapour Monitoring Plan (PDF 12.1 MB)
Air Quality Monitoring Plan (PDF 1.3 MB)
Written submissions received under the previous PGE Act
Under the previous Petroleum and Geothermal Energy Act, activities deemed through consultation with relevant co-regulatory agencies, to be of Medium Impact according to the criteria for classifying the level of environmental impact of regulated activities then public comment was sought on the associated Environmental Impact Report and draft Statement of Environmental Objectives.
![](https://www.energymining.sa.gov.au/__data/assets/image/0010/697015/BROCH120.jpg)
This brochure provides guidance on what to consider when making a public submission and how to protect privacy for personal information such as your contact details.
Copies of Public Consultation Submissions received under Regulation 14 of the Energy Resources Act 2000 can be found in the following table.
Operator | Activity | Gazetted | Document | ||
---|---|---|---|---|---|
Leigh Creek Energy | Geophysical Operations in PEL 650 |
15 April 2019 | PCC | GCC | DAR |
Beach Energy | Onshore Otway Production and Processing |
1 February 2019 | PCC | GCC | DAR |
Leigh Creek Energy | ISG Demonstration Plant |
28 February 2018 | PCC | GCC | DAR |
SAPEX | PEL 122 & 123 Fracture Stimulation |
4 June 2018 | PCC | GCC | DAR |
Santos | Production and Processing Operations (2017) |
28 March 2017 | Nil | GCC | N/A |
Senex | PEL 182 Controlled Access Zone Drilling, Completions and Well Operations |
3 November 2016 | Nil | GCC | N/A |
Santos | Drilling and Well Operations (2015) |
24 August 2015 | Nil | GCC | N/A |
Senex | Fracture Stimulation of Oil Targets in the Eromanga Basin |
29 June 2015 | Nil | GCC | N/A |
SAPEX | Arckaringa Basin Exploration Drilling (2013) |
19 June 2013 | Nil | GCC | N/A |
Beach Energy | Fracture Stimulation of the Nappamerri Trough |
4 May 2012 | PCC | GCC | N/A |
SAPEX | PEL 120 Exploratory Coal Seam Drilling |
4 June 2008 | Nil | GCC | N/A |
SAPEX | Arckaringa Basin Exploration Drilling (2007) |
12 September 2007 | Nil | GCC | N/A |
SAPEX | Arckaringa Basin Geophysical Operations |
12 September 2007 | Nil | GCC | N/A |
Eagle Bay Resources | Exploration Drilling and Production Testing |
2 June 2006 | Nil | GCC | N/A |
Santos | Production and Processing (2003) |
15 August 2003 | PCC | Nil | N/A |
Santos | Drilling and Well Operations (2003) |
15 August 2003 | PCC | GCC | N/A |
Archived reports
Archived activity reports have either reached their 5-year review period and have not been reviewed, or have been superseded by updated versions.
To access archived activity reports for activities which include (but not limited to) seismic surveying, drilling, production, geothermal, pipelines and facilities:
Fitness-for-purpose assessments
Section 86A of the Energy Resources Act 2000 requires a licensee to carry out fitness-for purpose (FFP) assessments of their facilities at least once each 5 years. Such assessments must include a statement of the state of the current, and expected (over an ensuing 5 year period), fitness-for-purpose of the facility. The report must also detail the grounds on which the statement was made, including the physical condition of the facility; the effectiveness of management systems for the operation and management of the facility; and any other factors which may adversely affect or compromise the fitness-for-purpose of the facility, including environmental factors and the adequacy and reliability of utilities.
The assessments must assess the risks of the facilities on public health and safety; the environment; and the security of supply of natural gas (so far as this maybe relevant). A report on the assessment must be prepared in accordance with Regulation 30 and submitted to DEM.
This section of the register contains list of the most recent reports on such assessments prepared by the licensee and submitted to DEM that are available to the public on request. Details of any current extensions of time granted, pursuant to Section 134 of the Energy Resources Act 2000, are located on the Licence Register. Historical reports are not listed on the website but are available to the public by request.
For any questions or to request a copy of any Fitness-For-Purpose Report, please contact DEM.Engineering@sa.gov.au.
Operator | Basin | Facility | Details of Current Report Available (Date Submitted / Extension of Time) | Report Availability |
---|---|---|---|---|
Air Liquide Australia | Otway | Caroline Carbon Dioxide Gas Plant | 18 October 2012 Resubmitted 5 March 2013 | Upon Request (2012 Report) |
Beach Energy | Cooper | Beach Energy's South Australian Production Facilities | 12 April 2019 | Upon Request |
Santos | Cooper | South Australian Cooper Basin Joint Venture's (SACBJV) Facilities in the Cooper Basin Note: This report incorporates PL 5, 9, 17 & 20 | 23 November 2018 Submission on 16 September 2023 currently under review | Upon Request (2018 report) |
Senex Energy | Cooper | Senex Cooper Basin Production Facilities Note: This report incorporates facilities from PEL 90B, 111, 113A and 516; PRL 15; PPL 208, 211-215, 217, 218 | 17 April 2018 | Upon Request |
* - Please note that dates with an asterisk indicate an extension of time has been granted for that particular Fitness for Purpose Report in accordance with Section 134 (1) of the Energy Resources Act 2000. All extensions of time can be accessed via the Licence Register.
Operator | Licence | Pipeline | Details of Current Report Available (Date Submitted / Extension of Time) | Report Availability |
---|---|---|---|---|
Epic Energy SA | PL 1 | Moomba to Adelaide |
24 February 2023 Resubmitted 6 October 2023 | Upon Request |
Santos Ltd | PL 2 | Moomba to Port Bonython | 30 April 2018* Extension of time granted until February 2024 | Upon Request |
Epic Energy SA | PL 3 & 4 | South East | 30 April 2019 | Upon Request |
APT O&M Services | PL 6 & 11 | Riverland Pipeline, Berri Mildura Pipeline | 28 September 2018 Submission on 22 September 2023 currently under review |
Upon Request (2018 report) |
APA Group | PL 7 | Moomba to Sydney | 20 July 2020 | Upon Request |
APA Group | PL 8 | Moomba to Sydney Ethane | 18 August 2021 | Upon Request |
Heathgate Resources | PL 12 | Beverly Lateral | 31 July 2020 | Upon Request |
SEA Gas | PL 13 | Port Campbell to Adelaide | 29 June 2022 | Upon Request |
Santos Ltd | PL 15 | Moon to Kerna | 9 May 2013* | Upon Request |
APA Group | PL 16 | South East South Australia | 29 November 2021 | Upon Request |
APA Group | PL 18 | QSN Link |
26 March 2019 Resubmitted 25 March 2022 | Upon Request |
Australian Gas Networks Limited | SFL 12 | Virginia Gate Station | 26 February 2021 Submission 22 September 2023 current under review | Upon Request (2021 report) |
* - Please note that dates with an asterisk indicate an extension of time has been granted for that particular Fitness for Purpose Report in accordance with Section 134 (1) of the Energy Resources Act 2000. All extensions of time can be accessed via the Licence Register.
Please note that PL 5, 9, 17 and 20 are all included in the SACBJV FFP report (as specified in the Extension of Time Letter dated 27 November 2017) in the Production Facilities Fitness for Purpose section above.
Please note that the fitness for purpose reporting requirements for PL 6, PL 11 and SFL 12 have been amalgamated (as specified the Amalgamation of reporting requirements for Virginia Gate Station (SFL 12), Riverland Pipeline (PL 6) and Berri to Mildura Pipeline (PL 11)).
Low level official surveillance activities
Section
The
This
Note: On 1 October 2009, the terminology in Section 74 of the Energy Resources Act 2000 was changed from "low/high level official supervision" to "low/high level official surveillance". Approvals granted prior to 1 October 2009 therefore refer to supervision status.
Operator | Activity | Letter Granting Low Surveillance Status | Letter Date |
---|---|---|---|
APA Group Pty | Pipeline Operations | PDF 311 KB | 29 July 2016 |
Air Liquide Australia | PL 21 Production Operations | PDF 29 KB | 3 July 2001 |
Beach Energy | Oil Production Operations | PDF 561 KB | 3 February 2011 |
Beach Energy | Well Operations | PDF 27 KB | 3 February 2004 |
Beach Energy | Geophysical Operations | PDF 28 KB | 23 December 2003 |
Beach Energy | Preliminary Survey Operations | PDF 194 KB | 27 August 2007 |
Epic Energy | Transmission Pipeline Operations | PDF 613 KB | 29 June 2020 |
SEA Gas | PL 13 Pipeline Operations | PDF 26 KB | 22 January 2004 |
SEA Gas | Pipeline Construction Operations | PDF 55 KB | 22 October 2004 |
Santos | Geophysical, Drilling, Well, Production and Pipeline Operations | PDF 275 KB | 17 February 2021 |
Senex Energy | Geophysical Operations | PDF 207 KB | 12 June 2014 |
Senex Energy | Drilling and Well Operations | PDF 35 KB | 10 September 2016 |
Senex Energy | Oil Production Operations | PDF 369 KB | 2 January 2019 |
Operator | Activity | Letter Granting Low Surveillance Status | Letter Date |
---|---|---|---|
APT O&M Services | Pipeline Operations | PDF 66 KB | 25 January 2007 |
APT O&M Services | Envestra License Pipeline Operations | PDF 32 KB | 22 February 2005 |
APT O&M Services | Pipeline Operations | PDF 218 KB | 5 March 2008 |
Epic Energy | Pipeline Operations | PDF 66 KB | 17 January 2008 |
Epic Energy | Pipeline Operations | PDF 76 KB | 5 December 2000 |
Gorodok | PL 8 Pipeline Operations | PDF 22 KB | 30 May 2001 |
Innamincka Petroleum | Well Operations | PDF 56 KB | 14 September 2004 |
Origin Energy | Preliminary Pipeline Operations | PDF 66 KB | 31 August 2004 |
Origin Energy | Geophysical Operations | PDF 66 KB | 11 April 2002 |
Origin Energy | Well and Geophysical Operations in the Otway Basin | PDF 10 KB | 31 October 2000 |
Santos | Geophysical Operations | PDF 23 KB | 16 October 2002 |
Santos | Drilling, Well and Production Operations | PDF 35 KB | 31 October 2000 |
Stuart Petroleum | Facility Construction Operations | PDF 57 KB | 9 July 2005 |
Stuart Petroleum | Geophysical Operations | PDF 45 KB | 23 December 2003 |
Stuart Petroleum | Well Operations | PDF 33 KB | 24 December 2003 |