Please note:

Effective 12 August 2024, changes were made to the Activity Specifications HC2A, APP1A, APP1B, APP1D, BS1B, BS3B, BS1A and BS2.

These were published in the SA Government Gazette on 1 August 2024 (pages 2353 – 2385). The amended activity specifications are below.

Effective from 21 August 2025, the Minister for Energy and Mining determined 'Install and connect a Community Battery to an approved Virtual Power Plan - in front of customer meter only' (CB1) to be a REPS activity for the purpose of Part 4 of Electricity Regulations 2012 and Part 4 of Gas Regulations 2012.

The activity was published in the South Australian Government Gazette on 21 August 2025 (pages 3561-3565).

Additional information that applied to all approved REPS energy efficiency activities can be found in the REPS activities general specification (PDF, 232.6 KB). Note that a number of these specifications make reference to the government's installation of ceiling insulation – consumer safety self-assessment and installer acknowledgement form (PDF, 314.9 KB).

Activity specifications

Insulation

Building sealing

Glazing

Heating and cooling

Water heating

Lighting

Stand-by power

Appliances

Time of Use Tariffs

Virtual Power Plant

Community Battery

Project based methods